Anhui Zhonglu Engineering Materials Co., Ltd.

Work happily and live happily!

Manufacturer from China
Verified Supplier
3 Years
Home / Products / Floating Silt Curtain /

Impermeable PVC Oil Boom Floating Sediment Curtain Turbidity For Spill Containment

Contact Now
Anhui Zhonglu Engineering Materials Co., Ltd.
Visit Website
City:hefei
Province/State:anhui
Country/Region:china
Contact Person:Mrsangela
Contact Now

Impermeable PVC Oil Boom Floating Sediment Curtain Turbidity For Spill Containment

Ask Latest Price
Video Channel
Brand Name :zhongloo
Model Number :Floating Silt Curtain
Certification :ISO9001
Place of Origin :China
MOQ :100 meters
Price :USD 12.6-16.7 per meter
Payment Terms :L/C, D/A, D/P, T/T
Supply Ability :30000 meters per Week
Delivery Time :10-15 days
Packaging Details :standard export packing or packed as customers' request
Products Name :PVC Silt Curtain Boom
Specification :15m/20m/25m
Type :Boom
Size :as Required
Transport Package :Standard Packing
HS Code :8907900090
Usage :Keep Construction Areas in Compliance and Protect
Trademark :zhongloo
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

PVC Oil Boom Impermeable Floating Turbidity Silt Curtain For Spill Containment

Product Description

Permeable floating silt curtain are the premium turbidity products to keep sediment under control for today's demanding marine construction and industrial environment. We offer a wide variety of pervious and impervious oil spill containment boom that meet? internation requirements .A silt barrier is a land or water based product designed to contain silt during construction or marine repair projects. For water areas, Triton floating turbidity barriers (also known as silt screen, silt booms, or turbidity curtains) surround and contain suspended silt and allow it time to settle. For land based jobs, staked silt fence form a barrier for runoff filtration. Correctly installing these floating silt curtain in silt retention helps you stay in compliance by containing silt and reducing stormwater pollution.
Turbidity curtain yellow can be used to control, contain, deflect or recover floating debris. Built to meet the specific needs and requirements? these barriers have effectively been used with hyacinth, duckweed, trash, plastic, cranberries, fish and marine life, logs and debris. Whether you need a seaweed protection barrier, trash control, aquatic plant containment or even marine life control, these yellow floating silt curtain can meet your needs.

Impermeable PVC Oil Boom Floating Sediment Curtain Turbidity For Spill Containment

Technical Parameter

PVC Flotation Oil Boom Specification
Model FOB-650 FOB-700 FOB-750 FOB-800 FOB-900 FOB-950 FOB-1000 FOB-1100
freeboard 180mm 260mm 250mm 330mm 325mm 320mm 160mm 250mm
sea gauge 320mm 400mm 410mm 540mm 650mm 770mm 340mm 500mm
standard length 20m15m,10m
standard 20KN 40KN 55KN 65KN 75KN 85KN 20KN 35KN
strength
scale of submerged weight 3.9 5.6 4.9 6.2 5.6 5.5 3.2 4.2
weight 3.7kg/m 6.2kg/m 7.1kg/m 8.4kg/m 9.3kg/m 9.5kg/m 3.3kg/m 4.5kg/m
Max. wave resisted 0.5m 1m 1.5m 1.8m 2m 1m 0.5m 0.5m
Max. wind speed resisted 10m/s 15m/s 15m/s 18m/s 18m/s 20m/s 10m/s 10m/s
Max. flow velocity resisted 1 1.5 2 2Kn 2.5Kn 2.5Kn 1 1
20m/60m Packing 1*1*0.6 1.2*1*1 1.3*1.1*1.1 1.4*1.5*1.2 1.4*1.6*1.3 1.4*1.7*1.4 1.4*1.7*0.8 1.4*1.7*1.2



Applications:
1.Block algae barricading applicable to fixed the water wash cloth for a long time, because of its drop quickly, the characteristicsof convenient operation, can be used to prevent because of port and waterway dredging, lakes and offshore oil platforms, such as water, the water civil engineering construction cause the pollution diffusion of turbid water, after the cloth from the surface to the bottom sediment, suspended solids and water form a block freely through the curtain, can not block the flow of water and isolates the clean area and pollution area.

2.Algae containment can also be used as an antifouling screen, which is an essential equipment to prevent the pollution caused by seabed sediment rising in the process of large-scale displacement of sea water and sediment in reclamation and harbor construction projects.The main means to prevent sediment pollution is to prevent the large area of sediment diffusion

Impermeable PVC Oil Boom Floating Sediment Curtain Turbidity For Spill Containment

FAQ:

Q1:How about your delivery time?
A1:Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q2:Can you produce according to the samples?
A2:Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q3:What is your sample policy?
A3:We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Inquiry Cart 0